Padysne HE was built in 1956-1958. (engineer-engineer-engineer Jonas Algirdas Skirkevičius). The reservoir is formed by flooding the Dysna River, an area of 1,085 square kilometers, a coastline of 16.64 km, and a 196-year-old Kw power plant (reconstructed in 1993).

+4
Reviews